Assignment on Electrical Engineering - Expert Assignment Help
  • Call us: +44 (203) 286 8649
  • contact@expertassignmenthelp.co.uk

Assignment on Electrical Engineering - Expert Assignment Help

Sample-Assignments

You can download the solution What is Planning Processes & Practice Planning for free. For further assistance in Engineering Assignments please check our offerings in Engineering assignment solutions. Our subject-matter experts provide online assignment help to Engineering students from across the world and deliver plagiarism free solution with free Turnitin report with every solution.

(ExpertAssignmentHelp does not recommend anyone to use this sample as their own work.)

Question

Also you might to use some References in the report, only the part you need to do

.Equipment from the laboratory manual (if available), placed
Equipment from the laboratory manual (if available), placed

Procedure in the appendix, and referenced.
Results: These two sections can be combined into
Discussion: a single section titled 'Results/Discussion.'

Conclusions
Recommendations
Bibliography (References)
Appendix (Include your sample calculations here with units.)

Solution

In this experiment, a model of the Rankine cycle is studied and its performance is observed. Some important indicator parameters like thermal efficiency and tower efficiency are also calculated.

Web-Banner-order-now

Objective:

The objective of this laboratory exercise is to get familiarized with the Rankine cycle heat engine. 

Equipment:

The RankineCyder™ steam turbine system made by Turbine Technologies Ltd. is a working model of a steam power plant and is used for the exercise. The basic equations for Rankine cycle analysis are applied by using empirical measurements at different points in the Rankine cycle. The RankîneCycIer' used in this lab exercise does not make use of the pump to compress the water. The boiler is filled to approximately 75 percent capacity with water prior to operating the equipment. The water is heated at nearly constant pressure by a flame fueled with liquid propane (LP). The heat addition process under constant pressure conditions causes an increase in the specific volume of water. The high temperature superheated steam is directed to the turbine where it expands and drives the electrical generator via a pair of spring shafts connecting the turbine and generator. The steam (likely still superheated) experiences constant pressure heat rejection in the cooling tower where the water condenses into a catch tube. 

For complete solution please download from the link below

    Download this Assignment Sample for FREE
    1. This form collects your email so that we can correspond with you through our newsletters. Checkout our Privacy policy for more information.
    2. Yes, i consent to this conditions.

    (Some parts of the solution has been blurred due to privacy protection policy)

    OrderNow

    Check all our academic help services

    programming assignment help
    dissertation writing service
    CV writing service
    essay writing service
    assignment writing service
    proofreading service